7×19 designed, manufactured and constructed this 650m multi line Zip Wire and Free Fall Drop over a disused Quarry now developed into an amazing watersports, adventure, wellbeing and accommodation venue.

Customer Profile

A former quarry, transformed into a superb, beautiful blue lake reserve with an amazing range of water and land-based activities for all ages. Nestled in the countryside of Kent with easy access from the motorway network and national rail, St Andrews Lakes offers a retreat from the hustle and bustle of everyday life in a setting that seamlessly combines breathtaking nature with the thrill of adventure. You can book the zip and drop here.

Project Key Information

  • To design and construct a thrilling multi-wire zip experience across the lake to further develop the commercial proposition for St Andrews Lakes. 
  • From the central Activity Tower install a Drop activity as an additional revenue generating activity.
  • Activity designed to complement the existing adventure brand for the venue.

How 7×19 delivered this Zip Wire Construction, Activity Tower and Drop

Concept Design

This project first started several years ago as the team at St Andrews Lakes were working out their vision for what has become an amazing adventure and well-being venue in Kent. The 7×19 team collaborated with the client to find the best location for the activities and produce designs ready for planning. 

During the process we took into consideration 

  • Target audience.
  • Practicality of location for the zip wire, to ensure it worked without the need for complex braking systems.
  • Zip throughput.
  • Identity additional activity to increase revenue potential. 

Technical Design

7×19 collaborates with a trusted set of partners and suppliers to work on the structural and zip engineering to ensure the concept can be brought to reality safely. 

Once this is done, we have a final set of technical drawings, a confirmed cost and a project plan.  

Manufacturing and Construction

The key to a smooth project is to be super detailed in the drawing, planning and preparation for the project. This project was no different, from making sure the foundations are installed precisely, the steel fabricators working to the detailed drawings, all meant a smooth zip line construction.

This Zip line required a starting tower, so we designed a flexible activity tower with the additional activity of a Drop installed to enhance the visitor experience as well as creating additional revenue for the client. 

So often projects like this are completed in the winter, which adds a set of factors with cold or windy weather – on this project the team worked through some pretty cold and windy days to ensure completion on time and with the great by-product of getting some awesome images. 

Project Completion

Another happy customer with an operational zip, built on schedule, to ensure the other training and operational testing can all be completed in time for the planned opening date. 

Feedback on project completion;

"A superb job and a pleasure to work with such a professional team.

Looking forward to the launch to the public this weekend."

Andrew Mackness , Owner , St Andrews Lakes